Renewable Portfolio Standard

Last updated: August 28, 2018

Program Overview

Implementing Sector:State
Category:Regulatory Policy
State:Maine
Incentive Type:Renewables Portfolio Standard
Web Site:http://www.maine.gov/energy/initiatives/efficiency_renewable.html
Eligible Renewable/Other Technologies:Geothermal Electric, Solar Thermal Electric, Solar Photovoltaics, Wind (All), Biomass, Hydroelectric, Municipal Solid Waste, Combined Heat & Power, Fuel Cells using Non-Renewable Fuels, Landfill Gas, Tidal, Fuel Cells using Renewable Fuels, Other Distributed Generation Technologies

Authorities

Name:35-A M.R.S. § 3210
Date Enacted:1999
Effective Date:3/2000
Name:CMR 65-407-311
Date Enacted:10/22/2007
Effective Date:11/6/2007
Name:35-A M.R.S. § 3210-C
Date Enacted:6/1/2006
Name:Public Law 413
Date Enacted:06/29/2011
Name:H.P 810 / L.D. 1147

Summary

Maine's original Renewable Resource Portfolio Requirement was passed as part of the state's 1997 electric utility restructuring law.  In 1999, Maine's Public Utility Commission (PUC) adopted rules requiring each electricity provider to supply at least 30% of their total electric sales using electricity generated from eligible renewable and certain energy efficiency resources. At the time of passage, the required percentage of renewable energy was actually lower than the existing percentage supplied.

Eligible Technologies

Eligible facilities include those up to 100 megawatts (MW) in capacity that use fuel cells, tidal, solar, wind, geothermal, hydro, biomass, or municipal solid waste in conjunction with recycling. Electricity generated by efficient combined heat and power (CHP) facilities and other systems that qualify as "small power production facilities" under the federal Public Utility Regulatory Policies Act of 1978 (PURPA) also are eligible.

Since 1999, the renewable portfolio standard (RPS) has been amended several times and two separate classes designated. Class II includes existing renewables, which are eligible to meet the 30% requirement described above. Class I is composed of new renewables that have come on-line after September 1, 2005. Unlike Class II, municipal solid waste facilities and CHP facilities are not eligible for Class I, and there are more stringent hydropower qualifying requirements. In addition, new wind installations may exceed 100 MW.

Requirements

The schedule for the Class I standard is as follows:

  • 1% for the period from 1/1/2008 to 12/31/2008
  • 2% for the period from 1/1/2009 to 12/31/2009
  • 3% for the period from 1/1/2010 to 12/31/2010
  • 4% for the period from 1/1/2011 to 12/31/2011
  • 5% for the period from 1/1/2012 to 12/31/2012
  • 6% for the period from 1/1/2013 to 12/31/2013
  • 7% for the period from 1/1/2014 to 12/31/2014
  • 8% for the period from 1/1/2015 to 12/31/2015
  • 9% for the period from 1/1/2016 to 12/31/2016
  • 10% for the period from 1/1/2017 to 12/31/2022

Compliance

The PUC has approved the use of NEPOOL Generation Information System (GIS) certificates (which are similar to renewable energy certificates, or RECs) to satisfy the portfolio requirement. GIS certificates are awarded based on the number of kilowatt-hours (kWh) of eligible electricity generated. GIS certificates used to meet the Class I standard may not also be used to satisfy the Class II standard. There is a 1.5 credit multiplier available for qualifying community-based renewable energy projects (see the Community-Based Renewable Energy Production Incentive for more information).

The PUC sets an alternative compliance payment (ACP) that utilities may pay instead of satisfying the standard by procuring GIS certificates. The PUC set the ACP base rate for the Class I standard at $57.12 per megawatt-hour (MWh) in 2007; this rate has been adjusted annually for inflation beginning in 2008. The 2017 ACP rate is $67.71 per MWh. Revenues from ACPs will be directed to the state's Renewable Resource Fund).

Legislation enacted in 2011 (Public Act 413) required the PUC to study the renewable portfolio standard. The results were published in January 2012 in the comprehensive report, MPUC RPS Report 2011 - Review of RPS Requirements and Compliance. Furthermore, the Maine PUC submits an annual report on the status of compliance with the new renewable resources (Class I) portfolio requirement.

Maine Wind Energy Goals

In addition to the standard above, there are three goals for wind energy development in Maine: (1) at least 2,000 MW of installed capacity by 2015; (2) at least 3,000 MW of installed capacity by 2020, of which there is a potential to produce 300 MW from facilities located in coastal waters or offshore; and (3) At least 8,000 MW of installed capacity by 2030, of which 5,000 MW should be from facilities in coastal waters or offshore. The first two goals were established in April 2008 (L.D. 2283), and the third was established in April 2010 (L.D. 1810).  

Solar system price checker

Design Your Solar Home

START

Market Trend

12 3

Input your address to see if it is solar friendly and how much you can save with solar.

Great. Your address is perfect for solar. Solar incentive is still available. Select monthly utility cost and calculate the size of solar system you will need now.

Whoa ! Going solar is definitely a smart decision.

kw System size years Payback period Lifetime savings

No money down, 100% finance is available.