Implementing Sector: | State |
Category: | Regulatory Policy |
State: | Maryland |
Incentive Type: | Net Metering |
Web Site: | http://webapp.psc.state.md.us/Intranet/CaseNum/submit_new.cfm?DirPath=\ColdfusionEWorkingGroupsinterconnection%20for%20Net%20Metering&CaseN=Interconnection%20for%20Net%20Metering |
Eligible Renewable/Other Technologies: | Solar Photovoltaics, Wind (All), Biomass, Combined Heat & Power, Fuel Cells using Non-Renewable Fuels, Wind (Small), Hydroelectric (Small), Anaerobic Digestion, Fuel Cells using Renewable Fuels |
Name: | Md. Public Utility Companies Code § 7-306 |
Date Enacted: | 1997 (subsequently amended) |
Name: | COMAR 20.50.10 |
Date Enacted: | 08/16/2011 |
Effective Date: | 02/20/2012 (most recent amendments) |
Name: | HB 1087- Community Solar Energy Generating System Program |
Name: | SB 353- Installation of Solar Electric Generatiing Facility- Net Interconnection Agreement |
NOTE: In June 2016, the Maryland Public Service Commission (PSC) voted to adopt final regulations for the Community Solar Pilot Program. The regulations were drafted in November 2015 pursuant to the Community Solar Pilot Program enacted by the state legislature in May 2015. The final regulations establish the pilot program with an emphasis on providing benefits for low and moderate income customers. This DSIRE post will be updated soon after the final regulations are posted in the Maryland Code.
Maryland’s net-metering law has been expanded several times since it was originally enacted in 1997. In their current form, the rules apply to all utilities -- investor-owned utilities (IOUs), electric cooperatives and municipal utilities. Residents, businesses, schools or government entities with systems that generate electricity using solar, wind, biomass, fuel cell, closed-conduit hydroelectric, and micro-CHP resources are eligible for net metering. The law permits outright ownership by the customer-generators as well as third-party ownership structures (e.g., leases and power purchase agreements). The provisions allowing for micro-CHP systems (H.B. 1057) and certain third-party ownership structures (S.B. 981) were added in May 2009 and took effect July 1, 2009. Net metering was extended to fuel cell electricity generation systems in May 2010 (H.B. 821) and closed-conduit hydroelectric facilities in April 2011 (S.B. 271).
Other important details of Maryland's net metering policy include:
Utilities must install a meter at a customer's facility capable of measuring the flow of electricity in both direction (if necessary), and must offer net metering through a tariff or contract at non-discriminatory rates compared to those offered to customers that do not net meter. The net-metered customers are typically required to pay a monthly customer charge regardless of the amount of electricity generated. However the customers are billed only for the energy that they use, netted against the amount generated by the customer. SB 353 enacted in May 2015, allows a person or a company who is installing a solar generation facility on the customer’s property to submit application for interconnection with the electric distribution facility. While the solar installer might accept payment prior to the installation, they must refund the payment if the application for interconnection is denied.
Virtual Net Metering
HB 1087 enacted on May 2015 authorizes the Public Service Commission (PSC) to establish a three year pilot program for community solar projects in the State. Community solar projects must be sized 2 MW or less, and must have at least 2 subscribers. Customers of all rates classes including residential, commercial, and people in leases properties can participate in the community solar project. Value of electricity generated by the solar system is credited to its subscribers through virtual net-metering. Individual subscriber may not receive credit for more than 200% of the subscriber's baseline annual usage. Individual subscriptions are capped at 200 kW, and must be less than 60% of the total subscription of the particular community solar system.
Community solar energy system must be located in the same electric service territory as its subscribers. Any unsubscribed electricity from the community solar projects is sold to the electric company at the electric company’s avoided cost. The legislation allows any third party to finance, build or operate a community solar project. The PSC is required to adopt regulations to implement the pilot program before May 15, 2016. The PSC must also in consultation with the Maryland Energy Administration convene a stakeholder workgroup to study the benefits and costs of the pilot program and make recommendations on the advisability of establishing a permanent program by July 1, 2019. Total solar capacity installed under this pilot program shall count towards the total state net-metering cap of 1,500 MW.
Customers with systems that meet all applicable safety and performance standards established by the National Electrical Code (NEC), the Institute of Electrical and Electronics Engineers (IEEE), Underwriters Laboratories (UL) and any other PSC requirements may not be required by utilities to install additional controls, to perform or pay for additional tests, or to purchase additional liability insurance.
Input your address to see if it is solar friendly and how much you can save with solar.
Great. Your address is perfect for solar. Solar incentive is still available. Select monthly utility cost and calculate the size of solar system you will need now.
kw System size | years Payback period | Lifetime savings |
No money down, 100% finance is available.
Explore New Solar Potentials with NEM 3.0 on HahaSmart
April 26, 2023NEM 3.0 Goes Live in California: What It Means for EPCs and Homeowners?
April 13, 2023Increase Your Solar Sales with Our New Feature: Solar Access with Google Sunroof
March 28, 2023Homeowner Profiles Connect with Solar Pros
March 2, 2023