Implementing Sector: | Local |
Category: | Financial Incentive |
State: | Illinois |
Incentive Type: | Green Building Incentive |
Web Site: | http://www.cityofchicago.org/city/en/depts/bldgs/provdrs/green_permit.html |
Administrator: | Chicago Center for Green Technology |
Eligible Renewable/Other Technologies: | Solar - Passive, Solar Water Heat, Solar Space Heat, Solar Photovoltaics, Wind (All), Biomass, Geothermal Heat Pumps, Daylighting, Wind (Small), Hydroelectric (Small) |
Eligible Efficiency Technologies: | Comprehensive Measures/Whole Building, Yes; specific technologies not identified |
Name: | Green Permit Program Benefit Tier Structure |
The Chicago Department of Buildings (DOB) Green Permit Program provides developers and owners with an incentive to build green by streamlining the permit process timeline for projects which are designed to maximize indoor air quality and conserve energy and resources.
The DOB offers two Green Permit Programs for projects that include green elements: the Green Permit Benefit Tier Program and the Green Elements Permit Program. The Green Permit Benefit Tier Program offers qualifying projects an expedited permit process and possible reduction of permit fees. The Green Elements Permit Program also offers projects with green elements (geothermal systems, green roofs, solar photovoltaic systems, rainwater harvesting systems, solar thermal panels and wind turbines) a priority review process.
Green Benefit Tier Permit Process
Projects meeting the following criteria are eligible for the Green Benefit Tier Permit Process:
Green Elements Permit Process
Projects consisting solely of green roof, renewable energy equipment, rainwater harvesting, or geothermal installations are required to submit a permit application to the Green Permit Program Project Administrator for proecessing.
Incentives
Projects accepted into the Green Permit Program can receive permits in fewer than 30 business days. The number of green building elements included in the project plans and project complexity determines the length of the timeline. In addition, projects which meet the most stringent sustainability guidelines may also qualify for a partial waiver of consultant code review fees, up to $25,000.
Application Procedure
Interested applicants must involve DOB early in the design process. DOB will help to guide the applicant through the process to ensure the shortest permitting process time.
Input your address to see if it is solar friendly and how much you can save with solar.
Great. Your address is perfect for solar. Solar incentive is still available. Select monthly utility cost and calculate the size of solar system you will need now.
kw System size | years Payback period | Lifetime savings |
No money down, 100% finance is available.
Explore New Solar Potentials with NEM 3.0 on HahaSmart
April 26, 2023NEM 3.0 Goes Live in California: What It Means for EPCs and Homeowners?
April 13, 2023Increase Your Solar Sales with Our New Feature: Solar Access with Google Sunroof
March 28, 2023Homeowner Profiles Connect with Solar Pros
March 2, 2023