Priority Permit Processing for Green Buildings

Last updated: August 28, 2018

Program Overview

Implementing Sector:State
Category:Financial Incentive
State:Hawaii
Incentive Type:Green Building Incentive
Start Date:05/12/2006
Eligible Renewable/Other Technologies:Solar - Passive, Solar Water Heat, Solar Space Heat, Solar Photovoltaics, Wind (All), Biomass, Geothermal Heat Pumps, Daylighting, Wind (Small), Hydroelectric (Small)
Eligible Efficiency Technologies:Comprehensive Measures/Whole Building

Authorities

Name:HRS §46-19.6
Date Enacted:5/12/2006
Effective Date:5/12/2006

Summary

Hawaii Revised Statutes (HRS) §46-19.6 requires each county agency that issues building, construction, or development-related permits to establish a procedure for priority processing of permit applications for construction projects incorporating energy and environmental design building standards. The priority processing will be provided at no additional cost.

Buildings eligible for priority processing are those that meet the "energy and environmental design building standards". These standards can be achieved by earning either a Leadership in Energy and Environmental Design (LEED) silver rating, a two Green Globes rating, or a comparable state-approved, nationally recognized, and consensus-based guideline, standard, or system.

For further information, contact the appropriate county building department.

Solar system price checker

Design Your Solar Home

START

Market Trend

12 3

Input your address to see if it is solar friendly and how much you can save with solar.

Great. Your address is perfect for solar. Solar incentive is still available. Select monthly utility cost and calculate the size of solar system you will need now.

Whoa ! Going solar is definitely a smart decision.

kw System size years Payback period Lifetime savings

No money down, 100% finance is available.