PETALING JAYA: Cove Suria Sdn Bhd has awarded a RM261 million turnkey contract to Cypark Resources Bhd to build a large scale 30MW solar plant at Empangan Kelinchi, Negeri Sembilan.
The job involves Engineering, Procurement, Construction and Commissioning (EPCC) and the Operation and Maintenance (O&M).
The contract period for the EPCC is for 24 months from the commencement date, and 21 years for the O&M.
The completion date, meanwhile, will be upon the issuance of the Commercial Operation Date (COD) by Tenaga Nasional Bhd (TNB).
The commencement date of the O&M shall also be upon the COD
Listed on the main market of Bursa Malaysia since 2010, Cypark is an environmental technology and engineering specialist focusing on the area of integrated renewable energy, waste management solutions, and environmental remediation.
Input your address to see if it is solar friendly and how much you can save with solar.
Great. Your address is perfect for solar. Solar incentive is still available. Select monthly utility cost and calculate the size of solar system you will need now.
kw System size | years Payback period | Lifetime savings |
No money down, 100% finance is available.
Comments