Solar panel installation is the final step

Jason RothmanJuly 2, 2018 336 0

Solar panel installation is the final step

The solar panel installation is an exciting time for every homeowner who wants to go solar but it is the final part of a process.

Your solar installer will start by prepping your roof and making sure the shingles or tiles are properly attached. Then, they put in electrical wiring that will connect to your electrical panel and general power system.

After the electrical wiring is complete, they will install racking to support your panels (this is the only piece of equipment that will actually be attached to your roof). Once the racking is level and safely attached, the panels are placed on the racking. Finally, your inverter or inverters are connected to the panels to convert direct current (DC) energy into the alternating current (AC) energy used in homes and on the electric grid.
 

The timeline for the installation

The timeline for the installation will range from one to three days, completely dependent on the size of the system you are installing. One additional factor that can add time to your installation process is putting in a power meter for net metering. If your installer needs to add a power meter, this will add a few hours to your solar panel installation.
 

Solar panel approval and interconnection

The final step of going solar is “flipping the switch,” so to speak, and officially commencing to generate power from your rooftop. Before you can connect your solar panels to the electric grid, a representative from your town government will need to inspect the system and give approval. During this inspection, the representative will essentially be double-checking your installer’s work.

He or she will verify that the electrical wiring was done correctly, the mounting was safely and sturdily attached, and the overall install meets standard electrical and roof setback codes.

Following this local inspection, you will be ready for official grid interconnection. A representative from your electric company will come by to do their own final evaluation of the solar panel system. As long as there are no glaring issues, your panels will go live the moment they “give the okay” and connect your system to the grid. You can expect to wait two weeks to a month for the town approval and utility approval to occur and interconnection to go live.

If you want to move into the future and join the solar revolution, or if you want to find out what solar panels are right for you, go to HahaSmart.com and try our price checker tool. You can see how much a system will cost, and how much you can save over the next 20 years.

For more information relating to going solar, don't forget to visit our solar blog section for more handy guides and articles.

Solar system price checker

Comments

Design Your Solar Home

START

12 3

Input your address to see if it is solar friendly and how much you can save with solar.

Great. Your address is perfect for solar. Solar incentive is still available. Select monthly utility cost and calculate the size of solar system you will need now.

Whoa ! Going solar is definitely a smart decision.

kw System size years Payback period Lifetime savings

No money down, 100% finance is available.

Looking for certified solar installer? Sign up now and we will find them for you.

Do not show this information again.